Haichao Yayuan Sanyuan

No. 83 of Wangjiangmenwai Street

Basic Information

District
Uptown
Circle
Wang Jiang
Year Built
2021
Total Buildings
13
Total Units
1192
Greening Rate
30%
Size Range
272-483 sqm m²
Available Types
5-7 brs

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Jiang Cheng Lu Station Exit H Line 5 673 m ≈ 8min
Jiangcheng Lu Station Exit G Line 5 680 m ≈ 8min
Jiang Cheng Lu Station Line 5; Line 7 722 m ≈ 9min
Hou Tide Gate Metro Station Exit A Line 5 758 m ≈ 9min
Jiang Cheng Lu Station Exit C1 Line 7 758 m ≈ 9min
Jiang Cheng Lu Station Exit C2 Line 7 776 m ≈ 9min
Maozhoumen Metro Station Exit B Line 5 779 m ≈ 9min
Jiang Cheng Lu Station Exit A Line 5 789 m ≈ 9min
Waiting Wave Gate Metro Station Exit D Line 5 836 m ≈ 10min
Jiang Cheng Lu Station Exit D Line 7 844 m ≈ 10min
Jiang Cheng Lu Station Exit E Line 7 874 m ≈ 10min
Mou Chun Gate Station Line 5 875 m ≈ 10min
Awaiting Tide Gate Metro Station Exit C Line 5 886 m ≈ 11min
Wujiang Lu Station Exit C Line 1 1219 m ≈ 15min
Wujiang Road Metro Station Exit D Line 1 1223 m ≈ 15min
Wu Jiang Lu Station Exit B Line 1 1275 m ≈ 15min
Wujiang Lu Station Line 1 1275 m ≈ 15min
Wu Jiang Lu Metro Station Exit A Line 1 1305 m ≈ 16min
City Station Metro Station Exit A1 Line 1 1309 m ≈ 16min
Wujiang Lu Station Exit E1 Line 1 1334 m ≈ 16min

Available Properties