Changlin Fu

the cross of Renai and Minfeng road

Basic Information

District
Yuhang
Year Built
2022
Property Management
New Hope Property Management
Greening Rate
30.1%
Size Range
272-483 sqm m²
Available Types
5-7 brs
Developer

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Qiao Si Nan Metro Station Exit A2 Line 9 943 m ≈ 11min
Qiao Si Nan Metro Station Exit B Line 9 949 m ≈ 11min
Qiao Shi Nan Station Line 9 959 m ≈ 11min
Rujia Nan Metro Station Exit A Entrance with Elevator Line 9 974 m ≈ 12min
Qiao Shi Nan Metro Station Exit A1 Line 9 1000 m ≈ 12min
Passenger Transport Center Metro Station Exit A Line 1; Line 9 1109 m ≈ 13min
Passenger Center Metro Station Exit F2 Line 1; Line 9 1121 m ≈ 14min
Passenger Transportation Center Metro Station Exit F1 Line 1; Line 9 1135 m ≈ 14min
Passenger Transportation Center Metro Station Exit E Line 1; Line 9 1162 m ≈ 14min
Passenger Transportation Center Station Line 1; Line 9 1173 m ≈ 14min
Passenger Center Metro Station Exit B Line 1; Line 9 1201 m ≈ 15min
Passenger Transportation Hub Metro Station Entrance Line 1; Line 9 1202 m ≈ 15min
Passenger Transportation Center Metro Station Exit D1 Line 1; Line 9 1250 m ≈ 15min
Passenger Transportation Center Metro Station Exit D Line 1; Line 9 1293 m ≈ 16min
Passenger Transport Hub Metro Station Exit C2 Line 1; Line 9 1335 m ≈ 16min
Passenger Transportation Hub Metro Station Exit C1 Line 1; Line 9 1336 m ≈ 16min
Harvest Lake Station Under Construction Line 18 1338 m ≈ 16min