Yanxin Yufu

No.33,Yanjia Road

Basic Information

District
Uptown
Circle
Jingfang
Year Built
2021
Total Buildings
8
Total Units
617
Greening Rate
30%
Size Range
272-483 sqm m²
Available Types
5-7 brs

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Xin Tang Metro Station Exit B Line 4 428 m ≈ 5min
Xintang Metro Station Entrance Line 4 440 m ≈ 5min
Xintang Metro Station Exit C Line 4 504 m ≈ 6min
Xin Tang Metro Station Exit A2 Line 4 536 m ≈ 6min
Xin Tang Station Line 4 538 m ≈ 6min
Xin Tang Metro Station Exit A1 Line 4 628 m ≈ 7min
Jing Fang Metro Station Exit B Line 4 790 m ≈ 9min
Jing Fang Metro Station Exit A Line 4 823 m ≈ 10min
Jingfang Metro Station Exit C Line 4 920 m ≈ 11min
Jing Fang Station Under Construction Line 15;Line 4 1007 m ≈ 12min
Jingfang Metro Station Exit D1 Line 4 1030 m ≈ 12min
Jing Fang Metro Station Exit D3 Line 4 1064 m ≈ 13min
Jing Fang Metro Station Exit D2 Line 4 1108 m ≈ 13min
Jing Fang Metro Station Exit D4 Line 4 1164 m ≈ 14min
Jing Fang Metro Station Exit D5 Line 4 1201 m ≈ 15min
Jing Fang Metro Station Exit D6 Line 4 1222 m ≈ 15min
Hua Jia Chi Station Under Construction Line 15; Under Construction Line 18 1320 m ≈ 16min

Available Properties