Grean Town Lan

Huancheng North Road

Basic Information

District
Downtown
Circle
BaoShan Bridge
Year Built
2014
Total Buildings
12
Total Units
1542
Parking Spaces
800
Management Fee
¥4/m²
Property Management
Green City Property Service Group Limited Hangzhou First Branch Company
Greening Rate
28%
Size Range
272-483 sqm m²
Available Types
5-7 brs
Developer
Hangzhou Lvcheng Jinyu Real Estate

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Bao Shan Bridge Metro Station Exit C Line 5 510 m ≈ 6min
Bao Shan Bridge Station Line 5 550 m ≈ 6min
Bao Shan Qiao Metro Station Exit A2 Line 5 562 m ≈ 7min
Bao Shan Bridge Metro Station Exit A1 Line 5 567 m ≈ 7min
Pearl of Benevolence Bridge Metro Station Exit B1 Line 5 573 m ≈ 7min
Bao Shan Bridge Metro Station Exit B2 Line 5 600 m ≈ 7min
Jian Guo Bei Lu Station Exit B Line 5 1055 m ≈ 13min
Jian Guo Bei Lu Metro Station Exit A Line 2 1058 m ≈ 13min
Jian Guo Bei Lu Station Exit C Line 2 1077 m ≈ 13min
Jian Guo Bei Lu Station Exit F Line 2 1125 m ≈ 14min
Jian Guo Bei Lu Station Line 2; Line 5 1126 m ≈ 14min
Jian Guo Bei Lu Station Exit D Line 2 1182 m ≈ 14min
Jian Guo Bei Lu Station Entrance E1B Line 5 1186 m ≈ 14min
Jian Guo Bei Lu Station Exit E2 Line 5 1208 m ≈ 15min
Jian Guo Bei Lu Station Entrance E1A Line 5 1209 m ≈ 15min
Gates Street Metro Station Exit C Line 1 1257 m ≈ 15min
Zhan Nong Exit Metro Station Exit B Line 1 1345 m ≈ 16min
Zhan Nong Exit Station Under Construction Line 18; Line 1 1360 m ≈ 17min
Zhan Nong Gate Metro Station Exit B1 Line 1 1391 m ≈ 17min
Zhan Nong Exit Station Exit D Line 1 1397 m ≈ 17min

Available Properties