Tiancheng Jia Yuan

No.251,Tiancheng Road

Basic Information

District
Uptown
Circle
Zhalongkou
Year Built
2006
Total Buildings
22
Total Units
1002
Property Management
Hangzhou Yihua Real Estate Management Company Limited
Greening Rate
30%
Size Range
272-483 sqm m²
Available Types
5-7 brs
Developer

About This Compound

Compound will be built in 2025, decorated by developer .
The compound has two sections, the east section are office buildings and the west sections has 4 residential buildings.
The main layouts are from 272-483sqm.
2.1km to Jiang Cheng Road metro station.
Compound Features and Facilities
Transportation
Popular Layouts
Clydesdale Real Estate (One branch of the Clydesdale Destination Services) is the best channel for you if you are searching for Hangzhou apartment, Hangzhou House or Hangzhou Serviced apartment!
We are the best Hangzhou apartment rental company building up by a team of professional and energetic leasing agents!

Location & Transportation

Nearby Metro Stations

Station Line Distance Walk Time
Zhan Nong Kou Metro Station Exit C Line 1 439 m ≈ 5min
Gate Bridge Metro Station Exit B Line 1 459 m ≈ 5min
Zhan Nong Exit Station Exit B1 Line 1 495 m ≈ 6min
Zhang Nong Metro Station Exit Under Construction Line 18; Line 1 514 m ≈ 6min
Zha Nong Exit Metro Station Exit D Line 1 589 m ≈ 7min
Xi Men Lu Station Under Construction Line 15 598 m ≈ 7min
Zhan Nong Exit Station Exit A Line 1 602 m ≈ 7min
Dadiquan Metro Station Exit A Line 1 902 m ≈ 11min
Da Tie Guan Metro Station Exit E2 Line 5 974 m ≈ 12min
Da Tie Guan Metro Station Exit E1 Line 5 983 m ≈ 12min
Da Tie Guan Station Under Construction Line 15; Line 1; Line 5 993 m ≈ 12min
Iron and Steel Friendship Metro Station Exit B Line 1 1038 m ≈ 12min
Da Tie Guan Metro Station Exit C2 Line 1 1039 m ≈ 12min
Pudao Gate Metro Station Exit C1 Line 1 1040 m ≈ 13min
Da Tie Guan Metro Station Exit F Line 5 1052 m ≈ 13min
Hangzhou Metro Station Exit E Line 5 1290 m ≈ 16min
Hangzhou University Metro Station Exit A Line 5 1296 m ≈ 16min
Hangzhou University Metro Station Exit C Line 5 1415 m ≈ 17min
Hangzhou Metro Station Line 5 1471 m ≈ 18min

Available Properties